Karnataka 2nd PUC Electronics & Hardware Annual Exam Question Paper 2026 with Model Answers PDF
Karnataka 2nd PUC Electronics & Hardware Annual Exam Question Paper 2026 with Model Answers PDF: Students can download the Karnataka 2nd PUC Electronics and Hardware Annual Examination 2026 Question Paper and its corresponding Scheme of Evaluation. These documents help students practise solar photovoltaic systems, solar panel installation, charge controllers, inverters, batteries, renewable-energy applications, maintenance procedures and employability skills.
The 2026 II PUC Annual Examination (Exam-1) Electronics & Hardware paper carries 60 marks, contains 37 numbered questions and specifies 2 hours 15 minutes, including 15 minutes of reading time. The 12-page question paper contains Kannada and English versions, while the five-page Scheme of Evaluation provides reference answers, technical explanations, solar PV diagrams and question-wise marking guidance.
Karnataka 2nd PUC Electronics & Hardware Annual Exam 2026 – Overview
| Particulars | Details |
|---|---|
| Board | Karnataka School Examination and Assessment Board (KSEAB) |
| Class | 2nd PUC / Class 12 |
| Examination | 2026 Annual Examination – Exam-1 |
| Subject | Electronics & Hardware |
| Subject Code | 59 (NS) |
| Maximum Marks | 60 |
| Duration | 2 Hours 15 Minutes |
| Reading Time | 15 Minutes Included |
| Total Numbered Questions | 37 |
| Parts | A, B, C and D |
| Question Paper Languages | Kannada and English |
| Question Paper Pages | 12 |
| Model Answers Pages | 5 |
| Document Format |
Download Electronics & Hardware Question Paper 2026 with Model Answers PDF
Download the original Karnataka 2nd PUC Electronics & Hardware Annual Examination 2026 Question Paper and its separate Scheme of Evaluation using the following links.
| Document | Download |
|---|---|
| Electronics & Hardware Annual Question Paper 2026 12 Pages | 60 Marks | Kannada and English | Download Question Paper PDF |
| Electronics & Hardware Model Answers 2026 Scheme of Evaluation | 5 Pages | Download Model Answers PDF |
Download Note: These Google Drive links were supplied for this article. Students can view the documents online or download them for offline examination preparation.
Electronics & Hardware Annual Exam 2026 Question Paper Pattern
The examination consists of four parts, including objective, short-answer, three-mark and six-mark descriptive questions.
| Part | Question Numbers | Answer Requirement | Marks |
|---|---|---|---|
| A | 1–10 | All 10 MCQs | 10 |
| B | 11–23 | Any 10 × 2 | 20 |
| C | 24–33 | Any 6 × 3 | 18 |
| D | 34–37 | Any 2 × 6 | 12 |
| Maximum Marks | 60 | ||
Important: The question paper specifies conversion of marks obtained out of 60 into a 50-mark component during evaluation. Students should refer to the original examination instructions for this provision.
Important Instructions for Students
- The question paper contains 37 objective and subjective questions.
- The examination duration includes 15 minutes for reading.
- Follow the internal-choice requirements for each part.
- Only the first written responses in Part A are considered for evaluation.
- Employability Skills questions are provided in English only.
- Employability Skills questions must be answered in English.
- Draw the required solar PV block diagrams clearly and label their components.
- Answer technical questions using correct terminology and the prescribed concepts.
Part A – Electronics & Hardware MCQ Answer Key 2026
Part A contains ten multiple-choice questions carrying one mark each. The following table records the answers printed in the supplied Scheme of Evaluation, with a clarification for Question 4.
| Q. No. | Question Topic | Printed Model Answer |
|---|---|---|
| 1 | Shortcut to underline text in a spreadsheet | d) Ctrl+U |
| 2 | Text boxes in first LibreOffice Impress slide | a) 1 |
| 3 | Solar-panel current in parallel connection | a) Same |
| 4 | Solar system where grid power is unavailable | a) On-grid system* |
| 5 | Primary function of an inverter | b) DC-to-AC conversion |
| 6 | Device between solar panel and battery | c) Charge controller |
| 7 | Cost affecting rural installation LCC | a) Labour |
| 8 | Main component of business strategy | a) Mission |
| 9 | Main energy source for solar charging station | b) Sunlight |
| 10 | Power source for solar rickshaw propulsion | c) Electric motor |
*Important Correction for Question 4: The question asks which system is suitable when grid electricity is unavailable. The technically correct response is (b) Off-grid system. The supplied Scheme of Evaluation prints option (a), On-grid system, which does not match the question. This discrepancy is identified without changing the original PDF.
Technical Note for Question 3: The model answer prints “Same”. For parallel-connected solar panels, voltage is shared across the branches, while branch currents depend on the panel characteristics and operating conditions. The total current is the sum of the branch currents.
Part B – Two-Mark Electronics & Hardware Questions
Part B contains thirteen questions, numbered 11 to 23. Students must answer any ten questions, carrying twenty marks.
| Question | Topic |
|---|---|
| 11 | Types of spreadsheet software |
| 12 | Steps to start LibreOffice Impress |
| 13 | Charge controller |
| 14 | Two types of solar-panel wiring |
| 15 | Function of inverter in a solar PV system |
| 16 | Open-circuit voltage |
| 17 | Causes of charge-controller failure |
| 18 | Series and parallel connections |
| 19 | Benefits of regular solar PV maintenance |
| 20 | Solar charging station |
| 21 | Types of solar panels |
| 22 | Components of a solar lantern |
| 23 | Inverter-testing precautions |
Questions 11 and 12 – Spreadsheet and Presentation Software
Q11: The Scheme of Evaluation lists Microsoft Excel, LibreOffice Calc and Google Sheets as spreadsheet applications.
Q12: The prescribed steps for opening LibreOffice Impress include checking that the application is installed, searching for LibreOffice Impress, opening the application and selecting or dismissing the template dialogue.
Questions 13 to 15 – Solar PV Components
Q13 – Charge Controller: In a solar system with battery storage, a charge controller regulates charging and discharging, helping prevent overcharging and excessive discharge.
Q14 – Solar Panel Wiring: Solar panels can be connected in series or parallel.
Q15 – Inverter: An inverter converts the DC electricity from a solar PV system into AC electricity for compatible electrical loads.
Question 16 – Open-Circuit Voltage
Open-circuit voltage (VOC) is the voltage measured across the terminals of a PV module when the circuit is open and no load current flows.
Source Clarification: The supplied evaluation sheet incorrectly refers to a maximum load being connected. An open circuit means that the load path is disconnected, not that maximum load is applied.
Question 17 – Charge Controller Failure
Question 17 asks for two main causes of charge-controller failure. The model-answer sheet refers to the absence of a maintenance policy and a serious lack of maintenance, but also includes a general reference to solar home systems that does not itself identify a cause.
Students should consult the original marking scheme and study the prescribed material on controller faults and maintenance. The ambiguous source wording should not be treated as a complete technical fault diagnosis.
Question 18 – Series and Parallel Connections
| Series Connection | Parallel Connection |
|---|---|
| Panels are connected end to end. | Panels are connected across common terminals. |
| The same current flows through the series path. | Current can flow through multiple branches. |
| Panel voltages add together. | Branch currents add together. |
Questions 19 to 23 – Maintenance and Solar Applications
Q19: Regular maintenance helps keep a solar PV system clean, supports reliable operation and can help detect problems early. The supplied scheme also lists general benefits of solar energy rather than only maintenance-specific benefits.
Q20: A solar charging station uses electricity generated from solar energy to charge batteries or suitable electrical vehicles and devices.
Q21: The source scheme lists monocrystalline and polycrystalline solar panels.
Q22: The three principal components of a solar lantern are the solar panel, storage battery and lamp.
Q23: The Scheme of Evaluation mentions electrical insulation gloves, disconnect switches and measuring equipment. Inverter testing involves electrical hazards and should be undertaken only by competent personnel using approved isolation and testing procedures.
Part C – Three-Mark Electronics & Hardware Questions
Part C contains Questions 24 to 33. Students must answer any six questions, carrying eighteen marks.
| Question | Three-Mark Topic |
|---|---|
| 24 | Steps to print a presentation |
| 25 | Grid-connected solar PV system diagram |
| 26 | Self-awareness and managing emotions |
| 27 | Solar PV site-survey parameters |
| 28 | Inverter performance checking |
| 29 | Government solar initiatives |
| 30 | Life Cycle Cost analysis |
| 31 | Flexible solar panels for portable use |
| 32 | Benefits of solar battery charging |
| 33 | Working of a solar streetlight |
Question 24 – Printing a Presentation
The prescribed steps include:
- Open the presentation.
- Select File and then Print, or use Ctrl+P.
- Review the print dialogue box.
- Choose the required number of copies.
- Select the slide range.
- Confirm the printing operation.
Question 25 – Grid-Connected Solar PV System
The question asks students to draw and label the layout of a grid-connected solar photovoltaic system.
A typical conceptual layout contains solar PV modules, appropriate DC-side protection, an inverter, AC-side protection, the building's electrical loads and a grid connection.
Diagram Note: The supplied Scheme of Evaluation contains a diagram for this question. Students should practise the original figure in the Model Answers PDF for examination purposes.
Question 26 – Self-Awareness
Self-awareness is understanding one's emotions, needs, desires, habits, behaviour and personal characteristics.
The Scheme of Evaluation recommends:
- Becoming more aware of one's emotional responses.
- Developing a habit of observing and tracking feelings.
Question 27 – Solar PV Site Survey
The evaluation scheme identifies the following considerations:
- Location of the solar PV array.
- Proposed inverter location.
- Required cable length between components.
- Annual and monthly solar irradiation at the selected site.
- Final selection of the PV system.
Students should explain the importance of the site survey in planning an effective solar installation.
Question 28 – Inverter Performance Checking
Question 28 tests awareness of electrical safety and inverter testing. The Scheme of Evaluation refers to insulation gloves, isolation switches, AC current measurement and battery-terminal voltage measurement.
These references describe examination material, not a standalone safe testing procedure. Actual testing should follow the manufacturer's instructions and be performed by trained personnel using appropriate electrical protection.
Question 29 – Government Solar Initiatives
The supplied evaluation scheme lists:
- PM-KUSUM Scheme.
- Surya Mitra Skill Development Programme.
- Grid-Connected Rooftop Solar Programme.
Important: These are the names given in the 2026 answer scheme. Current subsidies, eligibility and application rules may differ; students and applicants should check the latest official government notifications.
Question 30 – Life Cycle Cost Analysis
Life Cycle Cost (LCC) is an approach used to evaluate the overall cost of an asset throughout its useful life.
The source answer identifies:
- Initial capital cost.
- Maintenance cost.
- Operating cost.
- Residual value at the end of the asset's life.
Life-cycle analysis is useful when comparing the overall long-term cost of different solar-energy systems.
Question 31 – Flexible Solar Panels
Question 31 asks why flexible solar panels are suitable for portable applications.
Portable-use advantages include reduced weight, adaptability to suitable curved surfaces and easier integration into compact or mobile equipment. These points explain the question's intended subject.
Source Clarification: The supplied Scheme of Evaluation instead lists broad solar-energy benefits, including clean power and reduced operating costs, without directly explaining the flexibility and portability aspect. Students should refer to their prescribed textbook and the original scheme when reviewing this answer.
Question 32 – Solar Battery Charging
The evaluation scheme identifies these benefits:
- Clean and convenient energy use.
- Potential improvement in battery management and life.
- Reliable charging where suitable systems are installed.
- Lower operational carbon emissions.
- Potential eligibility for applicable government incentives.
The actual financial and environmental benefits depend on the equipment, charging controls and electricity source.
Question 33 – Solar Streetlight
The Scheme of Evaluation identifies the following main components:
- Tilted solar PV module mounted to receive sunlight.
- LED lighting unit fixed to a pole.
- Enclosure containing electrical control equipment.
- Solar charge controller.
- Supporting pole, mounting arm and related structural components.
In a typical solar streetlight, the panel charges a battery during daylight, and stored energy powers the LED lamp at night through suitable control circuitry.
Part D – Six-Mark Electronics & Hardware Questions
Part D contains Questions 34 to 37. Students must answer any two questions, carrying twelve marks.
| Question | Six-Mark Topic |
|---|---|
| 34 | Solar PV AC/DC connection block diagram |
| 35 | KUSUM Scheme and eligible beneficiaries |
| 36 | Solar panel cleaning and maintenance precautions |
| 37 | Solar-powered cold storage and night-time cooling |
Question 34 – Solar PV AC/DC Connection
Question 34 requires students to draw a block diagram of the AC/DC connections in a solar photovoltaic system.
Important components to identify in a conceptual PV system include:
- Solar photovoltaic array.
- DC-side connections and protective equipment.
- Inverter or power-conditioning system.
- AC-side output.
- Electrical loads.
- Storage or grid connection where applicable.
Diagram Note: The board's five-page Scheme of Evaluation contains the required AC/DC connection diagram. Students should use the original diagram rather than rely only on the written component list.
Question 35 – KUSUM Scheme
The model-answer document identifies the Government of India's KUSUM initiative, associated with solar-energy applications in agriculture, and refers to its launch in March 2019.
The evaluation scheme lists six beneficiary categories:
- Individual farmers.
- Groups of farmers.
- Farmer Producer Organisations (FPOs).
- Panchayats.
- Cooperative societies.
- Water User Associations.
Source Note: The printed question uses the wording “Kusuma Scheme”, while the model answer relates it to PM-KUSUM. The categories above follow the supplied evaluation scheme and should not be interpreted as an independently verified list of currently eligible applicants.
Question 36 – Solar Panel Cleaning and Maintenance
The six points identified in the Scheme of Evaluation concern:
- Appropriate electrical protective equipment.
- Checking that modules and arrays conform to system specifications.
- Comparing installed module numbers with the original design.
- Identifying newly developed shade problems.
- Checking panel inclination and seasonal positioning.
- Inspecting modules for cracks, loose components and other damage.
Safety Note: Solar PV systems can generate hazardous electrical voltage whenever illuminated. Cleaning, inspection and repair must follow the manufacturer's procedures and applicable electrical safety requirements. Damaged or electrically unsafe components should be handled by qualified personnel.
Question 37 – Solar-Powered Cold Storage
A solar-powered cold-storage system uses energy generated by photovoltaic modules to support refrigeration.
The evaluation scheme describes two operating periods:
Daytime Operation: Solar photovoltaic modules provide electrical energy to the cooling system. At the same time, thermal energy storage is charged, for example by creating ice or another cold-storage medium.
Night-Time Operation: The cold energy stored in the thermal energy storage system is used to maintain the required temperature when sunlight is not available.
The source refers to circulating refrigerant and delivering cooled air through an evaporator.
Technical Clarification: The supplied model answer contains wording suggesting that excess energy is stored in solar panels. The thermal storage described in the answer is separate from the photovoltaic panels: cold energy is retained in the thermal energy storage medium for later use.
Important Electronics & Hardware Topics for Revision
The actual 2026 Annual Examination tests the following areas:
- Solar Photovoltaic Systems: On-grid, off-grid and grid-connected PV concepts.
- Solar Modules: Monocrystalline and polycrystalline panels.
- Solar Wiring: Series and parallel connections.
- Charge Controllers: Functions, battery charging and related faults.
- Inverters: DC-to-AC conversion, inspection and safe testing.
- Solar Measurements: Open-circuit voltage and system performance.
- PV Installation: Site surveys, array location and solar irradiation.
- Solar Maintenance: Panel cleaning, shading and equipment inspection.
- Solar Applications: Streetlights, lanterns, charging stations and rickshaws.
- Cold Storage: Solar-powered refrigeration and thermal energy storage.
- Project Planning: Life Cycle Cost analysis and solar-energy programmes.
- Employability Skills: Spreadsheet software, presentation printing and self-awareness.
These are topics from the 2026 examination paper. They are not guaranteed questions for future examinations.
What Is Included in the Electronics & Hardware Model Answers 2026?
The five-page Scheme of Evaluation includes:
- Answers to ten multiple-choice questions.
- Spreadsheet and presentation software answers.
- Solar PV components and wiring explanations.
- Charge controller and inverter concepts.
- Open-circuit voltage and PV maintenance topics.
- Solar PV system diagrams.
- Self-awareness and employability-skills responses.
- Solar site surveys and system cost analysis.
- Solar charging and streetlight applications.
- PM-KUSUM beneficiary categories.
- Solar maintenance precautions.
- Solar-powered cold-storage working principles.
Editorial Clarification: The source contains technical inaccuracies or incomplete responses in several questions, particularly Q4, Q16, Q17 and Q31. This article identifies the discrepancies separately, while the downloadable Scheme of Evaluation is presented as supplied.
How to Practise the 2026 Electronics & Hardware Paper
- Download the complete 12-page Question Paper.
- Read the examination instructions and internal choices.
- Attempt all ten multiple-choice questions.
- Prepare two-mark definitions for charge controllers, inverters and solar charging stations.
- Revise series and parallel solar-panel wiring.
- Practise the grid-connected PV system diagram.
- Prepare three-mark answers on site surveys, life-cycle costs and solar applications.
- Revise the government solar initiatives listed in the scheme.
- Practise the AC/DC solar PV connection diagram.
- Prepare six-mark answers on maintenance and solar cold storage.
- Complete a timed practice paper within the prescribed duration.
- Compare answers with the five-page Scheme of Evaluation, keeping the identified source discrepancies in mind.
Frequently Asked Questions
What is the subject code for Karnataka 2nd PUC Electronics & Hardware?
The subject code is 59 (NS).
How many questions are included in the 2026 examination?
The question paper contains 37 numbered questions, with internal choices in Parts B, C and D.
What are the marks and examination duration?
The paper carries 60 marks and specifies 2 hours 15 minutes, including reading time.
Is the question paper available in Kannada and English?
Yes. The 12-page question paper includes Kannada and English sections. Employability Skills questions are provided in English only and must be answered in English.
Are Model Answers available for Electronics & Hardware 2026?
Yes. A separate five-page Scheme of Evaluation is available using the download link above.
How many six-mark questions must students answer?
Part D contains four six-mark questions. Students must answer any two for twelve marks.
Are solar energy questions included?
Yes. Solar PV systems, inverters, charge controllers, solar-panel wiring, maintenance, streetlights and cold storage feature prominently.
Is Electronics & Hardware (59) the same as Electronics (40)?
No. They are different Karnataka 2nd PUC subjects. Electronics & Hardware uses code 59, whereas Electronics uses code 40 and has a different examination pattern.
Is this the 2026–27 Model Question Paper?
No. This article covers the 2026 Annual Examination (Exam-1) Question Paper and Model Answers. The 2026–27 model papers are a separate collection.
More Karnataka 2nd PUC Question Papers
Students can practise using the Electronics & Hardware Model Question Papers 2026–27 – MQP 1 to 5.
For the different subject Electronics (40), visit the Electronics Annual Exam Question Paper 2026 with Model Answers.
Students can also download the Information Technology Annual Exam Question Paper 2026 and the Retail Annual Exam Question Paper 2026.
For the subject-wise collection, visit Karnataka 2nd PUC Model Question Papers 2027 – All Subjects.
Official KSEAB Examination Information
Students should consult the Karnataka School Examination and Assessment Board for examination notifications, question papers, evaluation schemes, timetables and official corrections.
Visit the Official KSEAB Website
Source Note: This article is based on the supplied Karnataka 2nd PUC Electronics & Hardware Annual Examination 2026 Question Paper and five-page Scheme of Evaluation. Where the source contains a technical inaccuracy, incomplete explanation or historical programme information, the editorial clarification is identified separately. The Google Drive links were supplied for this article.
Disclaimer: PediaWikiBlog is an independent educational website and is not affiliated with the Karnataka School Examination and Assessment Board (KSEAB). This article is intended for educational and examination-preparation purposes. Technical procedures, electrical maintenance and government programme applications must follow current official requirements and appropriate safety standards.